Business Type

micropile installation contractor, nakhon pathom jl pile co., ltd. specializes in micropile installation in confined and narrow spaces using i-micropiles and spun micropiles. we undertake direct contracts with project contractors and subcontracting work. we have our own stock of micropiles, foremen

flexible partnerships: we accept projects directly from homeowners, as well as collaborations with construction firms and renovation contractors.

low shrinkage concrete for structural work and concrete floor leveling work.

design contractors for building renovations - building extensions renovation of old commercial buildings second-hand commercial buildings renovation of commercial buildings improve the addition of the building from the floor to the roof. revive old buildings to look new. adjust the look to be good,

retail electrical equipment serving homes and factories with electrical equipment for system installations in housing projects, condominiums, apartments in pattaya, naklua, banglamung, and chonburi. our products range from basic electrical components for household use to professional tools for contractors

toilet head, bonnet (blue) 900 baht per set the toilet head sits flat on the floor, white, 350 baht per set.

construction supervision by engineers construction of warehouses, raw materials and stock products warehouse construction dc distribution center for both steel structure and concrete work from floor to roof including concrete work in factories, roads around factories, parking lots, contractors in

for more information, call +66 8-7550-8288 expanded metal mesh – wholesale prices, pak kret, nonthaburi square & round steel plates (drilled / non-drilled) – wholesale prices wire mesh steel for floor & road reinforcement – factory prices we supply floor reinforcement steel

must use a method to penetrate the floor to compress the chemical solution under the building. the technician team will explore and plan. the position of drilling the floor in order to allow the compressed chemical solution to cover all areas under the building. the drilling will be drilled about 30-